The flat ran off grid between March and the end of October this year.
A run of overcast skies at the end of October led to shutting down for around 3 weeks to ensure all available solar energy went to battery charging, bring the batteries back to 100% and the return of the clear days allowing the batteries to spend time in Absorb Charge mode to reverse any sulphation which might have attempted to establish itself.

Load is presently splitwith the solar system dealing with lighting and the circuit supplying the fridge, allowing long periods during the day when all energy is going towards battery charging
Subscribe

  • Battery Maintenace results

    A success. It has taken a week or so, but charge times lengthenned, with longer and longer periods in bulk rather than going straight to absorb.…

  • Maintenance weekend

    The rebuilt sustem has been running two and a half years without incident, including going through a winter with a helping hand from cheap rate…

  • Renewable energy reports

    January and february, mostly around 0.5 KWh during the day, mostly a consequence of the very bad shading suffered by the ground mounted array.…

  • Post a new comment

    Error

    default userpic

    Your IP address will be recorded 

    When you submit the form an invisible reCAPTCHA check will be performed.
    You must follow the Privacy Policy and Google Terms of use.
  • 0 comments